California ISO
   
Search

Congestion Revenue Rights

pdf 26K

Summary:


MRTU Fast Facts, Congestion Revenue Rights.


Extract:

Insurance Against Variable Congestion Costs. Congestion on the grid occurs when the total desired energy flows scheduled by buyers and sellers of power cannot fit on the power lines. This is when the ISO steps in and reschedules the electricity deliveries. Buyers and sellers whose power is reshuffled will be assessed congestion charges that reflect the cost of rearranging the desired schedules to fit the grid.


Document Locations:

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think