|
||||||
Joint Motion of the Cities of Anaheim and Riverside and the California ISO (1) to Impost a Limitation on the Length of SWPs Post-Hearing Reply Brief and (2) for Shortened Answer Period in Docket Nos. EL03-15-000, et al. (Transmission Revenue Requirement and Transmission Owner Issue)pdf 30K Summary:Joint Motion of the Cities of Anaheim and Riverside and the California ISO (1) to Impost a Limitation on the Length of SWPs Post-Hearing Reply Brief and (2) for Shortened Answer Period in Docket Nos. EL03-15-000, et al. (Transmission Revenue Requirement and Transmission Owner Issue) Document Locations: |