California ISO
   
Search

S-301A WECC Unscheduled Flow Reduction Procedure

pdf 109K

Summary:


Operating Procedure S-301A, Western Electricity Coordinating Council (WECC) Unscheduled Flow Reduction Procedure


Extract:

The combination of scheduled and unscheduled flows on a Transfer Path may exceed the transfer capability of that Transfer Path. This Unscheduled Flow Reduction Procedure (USF Reduction Procedure) will be utilized to reduce the Unscheduled Flows (USF) across a constrained Qualified Transfer Path.


Document Locations:

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think