|
||||||
S-315 Emergency Overload Mitigation Procedure for Stability Rated PathsVersion 3.1 pdf 102K Summary:Operating Procedure S-315 Emergency Overload Mitigation for Stability Rated Paths, Version No. 3.1, Effective 8/1/07, No Distribution Restriction Extract:Reduce flows on CAISO managed Interconnections and CAISO Internal Paths within twenty minutes as required by the WECC, through coordinated operational measures with adjacent interconnected Control Areas. Document Locations: |