California ISO
   
Search

S-313A POR/POD-Scheduling Path Cross Reference

Version 7.0

pdf 120K

Summary:


Operating Procedure Attachment A, S-313A POR/POD-Scheduling Path Cross Reference, Version No. 7.0, Effective 3/28/07, Distribution Restriction: None


Extract:

The California ISO Scheduling Paths are designated by a Point of Receipt or Delivery, a Voltage Designator, and a term that represents additional information about the path (e.g., Pseudo tie, Breaker Number, Switchyard or Balancing Authority Area). WECC Tagging Specifications require a single point to be designated as POR/POD on NERC tags. The following table provides a cross reference to match the NERC POR/POD with the ISO Scheduling Path.


Document Locations:

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think