|
||||||
S-313A POR/POD-Scheduling Path Cross ReferenceVersion 7.0 pdf 120K Summary:Operating Procedure Attachment A, S-313A POR/POD-Scheduling Path Cross Reference, Version No. 7.0, Effective 3/28/07, Distribution Restriction: None Extract:The California ISO Scheduling Paths are designated by a Point of Receipt or Delivery, a Voltage Designator, and a term that represents additional information about the path (e.g., Pseudo tie, Breaker Number, Switchyard or Balancing Authority Area). WECC Tagging Specifications require a single point to be designated as POR/POD on NERC tags. The following table provides a cross reference to match the NERC POR/POD with the ISO Scheduling Path. Document Locations: |