California ISO

Local Area Reliability Service (LARS) and Reliability Must Run (RMR) Designations

Annual process that identifies geographical areas with local reliability issues in the ISO Control Area along with measures to remediate those issues. Reliability Must Run Contracts are a means of ensuring power availability within identified areas.

Local Area Reliability Service (LARS)

2009 RMR Dual Fuel and Black Start Contract Status
pdf 81K | Abstract | 12/02/2008 09:41
2008 RMR Dual Fuel and Black Start Contract Status
pdf 94K | Abstract | 09/24/2008 08:40
2007 Local Area Reliability Service Recommendation and RMR Contract Status
pdf 140K | Abstract | 12/08/2006 13:07
2006 LARS & RAR Schedules
pdf 11K | Abstract | 06/20/2005 10:36
2007 LARS Request for Proposals
pdf 631K | Abstract | 06/20/2006 08:47

2007 LARS Preliminary Designations Report and Memorandum August, 2006

2007 Local Area Reliability Service Report (Gary DeShazo Report)
pdf 373K | Abstract | 08/31/2006 10:19

LARS Document Archive

 

Reliability Must Run

RMR Study Methodology
RMR Administrative Procedures
RMR Contracts
Reliability Must-Run (RMR) - Settlements
Settlements information related to RMR Agreements (annual agreements between the ISO and qualified generators within specific geographical areas of the ISO Control Area).
Annual RMR Informational Reports
2008 RMR Load Points
pdf 32K | Abstract | 12/27/2007 13:21
2007 RMR Contract Energy Load Points
pdf 86K | Abstract | 12/29/2006 10:36
2006 RMR Load Points
pdf 101K | Abstract | 03/23/2006 11:34
2006 RMR Contract Status
pdf 111K | Abstract | 03/23/2006 11:35
RMR Stakeholder Meetings

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think