All forced outages must be reported to the California ISO with a description of the cause and all remedial actions taken.

What's New

Release Notes For Upcoming SLIC Update
pdf 215K | Abstract | 01/25/2008 09:14

Outage Reporting Requirements and Technical Documentation
Generating Unit Forced Outage Reporting Using RTAM
pdf 933K | Abstract | 04/16/2007 11:22
SLIC RTAM Information Sheet
pdf 67K | Abstract | 04/10/2007 15:04
SLIC RTAM Interim User Interface Guide
pdf 940K | Abstract | 07/30/2007 13:48
SLIC Web Service API Guide
pdf 255K | Abstract | 04/10/2007 15:10
Generating Unit Outage Reporting Compliance
pdf 114K | Abstract | 07/13/2007 13:28
Questions and Answers on Forced Outage Reporting Requirements 4-Jun-2007 (Revised 29-Jun-2007)
pdf 93K | Abstract | 06/29/2007 12:50

Stakeholder Process to Determine Outage Reporting Requirements

Timely Generator Outage / Availability Notification
pdf 85K | Abstract | 05/31/2006 11:06
SLIC Web Client
Accurate and complete outage scheduling is vital to reliable operation of the transmission system. SLIC (Scheduling and Logging for the ISO of California) is a web-enabled interface for transmission and generation owners to communicate outage information to the California ISO.
Transmission Outage Reports
All transmission outages must be reported to the California ISO with a description of the cause and all remedial actions taken. Information is confidential. Access requires a valid California ISO user certificate.
Forced Outage Reporting Requirements