2009 Import Capability Assignment Process - Step 6 and
7
___________________________________________________
Summary
The CAISO has posted the information required by Step 6 of
the Import Capability Assignment Process (CAISO Tariff Section 40.5.2.2.1). The
CAISO will also be sending to Scheduling Coordinators via e-mail the
information required by Step 7 on July 9, 2008
___________________________________________________
Main
Text
The California ISO (CAISO) assigns import capability to Load
Serving Entities through their respective Scheduling Coordinators for
compliance with resource adequacy requirements for 2009 through a multi-step
process under CAISO Tariff Section 40.5.2.2.1. The CAISO has completed Steps 6
and 7.
Step 6 Requirement
CAISO posted on July 8 a document, entitled 2009 Assigned
and Unassigned RA Import Capability on Branch Groups into the CAISO Control
Area after Step 6, containing the following information:
The document is located on the Stakeholders
Initiative/Current Initiatives/Resource Adequacy/Import Allocation web page at:
http://www.caiso.com/1c44/1c44b2dd750.html.
Step 7 Requirement
CAISO will send an email on July 9 to each Load Serving
Entity, through its respective Scheduling Coordinator, the following
information:
___________________________________________________
For
More Information Contact
Catalin Micsa at cmicsa@caiso.com
916.608.5704
Grant Rosenblum at grosenblum@caiso.com
916.608.7138
The California ISO
strives to be a world-class electric transmission organization built around a
globally recognized and inspired team providing cost-effective and reliable
service, well-balanced energy market mechanisms, and high-quality information
for the benefit of our customers.
151 Blue Ravine Road, Folsom, CA 95630
EA/ComPR/IPS/ca