California ISO
   
Search

Planning for Second Dry Year Operation Reliability Study Report

pdf 393K

Summary:


This report identifies the impacts that drought conditions can have on the northern California power system based on forecasted peak load conditions. It further analyzes the risk of potential load losses due to either energy shortage and/or power grid constraints of overloads or voltage collapse. Finally, short and long term solutions are recommended. This report is part of the 2008 CAISO Transmission Plan.


Document Locations:

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think