|
||||||
2010-2012 Local Capacity Study Reportpdf 419K Summary:This is the 2010-2012 Long-term Local Capacity Requirement (LCR) Report that gives an outlook of future local capacity needs within the CAISO control area based on the assumption that certain approved transmission projects become operational. This report is part of the 2008 CAISO Transmission Plan. Document Locations: |