The California Independent System Operator Corporation (CAISO) provides electricity transmission and related reliability services under both State and federal authority that are essential to the California economy as well as the health and welfare of its citizens. In this regard, the CAISO’s core mission can be divided into three interrelated cornerstones:
• Maintain reliable electric service;
• Improve the efficiency of electric system operations, including the provision of open and non-discriminatory access to the transmission facilities under its control; and
• Identify and promote new investments in transmission infrastructure in a coordinated, open, transparent and participatory manner.


NERC Compliance

SOL Methodology Guideline for the Planning Horizon
pdf 61K | Abstract | 08/21/2007 13:31
Total Transfer Capability (TTC) Methodology
pdf 517K | Abstract | 08/21/2007 13:32
Compliance with NERC Reliability Standards
html 12K | Abstract | 04/05/2007 12:41

BPM for Reliability Requirements
Reliability Requirements / Resource Adequacy
Process to ensure adequate resources to serve all customers in real time. Also includes Deliverability, Import Allocation and Local Capacity Requirements.
Local Area Reliability Service (LARS) and Reliability Must Run (RMR) Designations
An annual process that identifies geographical areas with local reliability issues in the ISO Control Area along with measures to remediate those issues. Reliability Must Run contracts are a means of ensuring power availability within identified areas.

CAISO Transmission Standards, Processes and Policies
CAISO Grid Project Review Information Requirements
pdf 72K | Abstract | 12/11/2007 13:24
ISO Grid Planning Standards
pdf 118K | Abstract | 07/25/2002 16:16
NERC-WECC Planning Standards
pdf 4647K | Abstract | 02/12/2003 09:08
Transmission Control Agreement, Appendix E: Nuclear Protocols
    Version effective date: October 11, 2006
pdf 2436K | Abstract | 12/05/2006 14:00
New ISO Transmission Planning Process
pdf 70K | Abstract | 08/01/2005 11:39
Generation Assumptions for Grid Planning Studies
pdf 216K | Abstract | 04/20/2004 13:46
ISO/RTO Electric System Planning Current Practices, Expansion Plans, and Planning Issues
pdf 1648K | Abstract | 02/13/2006 13:20