California ISO
   
Search

Presentation - LMP Study Update

pdf 902K

Summary:


Recent release of LMP Study Results Review of marginal loss LMPs Additions to methodology: Previous: Calculation of EZGen Trading Hub LMPs See description in Sept. 2004 LMP Study 3C report LMP Study runs starting with January 2005 reflect treatment of SMUD & WAPA as an “Embedded Control Area” Movement of MID, TID, & Capt. Jack-Olinda occurs later Limited addition of transmission lines outside CAISO Integration of Local Market Power Mitigation in LMP Study (effective with May 2005 results) Additions to methodology will be described in detail in a supplement to LMP Study 3C’s “Description of Methodology”. Policy aspects will be discussed in other stakeholder meetings.


Document Locations:

© 2005 -  California ISO
All Rights Reserved
Sitemap  Privacy Policy  Legal Notice  Tell Us What You Think