Submission of Non-PTO Wheeling Datapdf 254K Summary:The document describes the reporting requirements for Scheduling Coordinators who submit load schedules for Non-Participating Transmission Owners within CAISO Control Area and how the CAISO uses such information to calculate the Wheeling Access Charge. Extract:Scheduling Coordinators (SC's) who schedule load for a Non-Participating Transmission Owner located within the CAISO Control Area and who use CAISO transmission capacity exceeding the Non-PTO transmission contract limit will incur a Wheeling Access Charge. SC's are required to self-report information about such scheduled transactions to the CAISO each month (refer to CAISO Tariff Section 26.1.4.4). The CAISO uses these self-reports to calculate the Wheeling Access Charge for each SC. Document Locations: |