|
||||||
Review of Summer 2006 Loads and Resources Operational Outlook ReportThe date range of the table on page 12 was changed from September 1, 2005 through September 30, 2006,.... to July 1, 2005 through July 31, 2006. pdf 326K Summary:Review of Summer 2006 Loads and Resources Operational Outlook Report presented at April 19, 2006 Operations Committee Meeting Extract:This updated 2006 Summer Operations Loads and Resource Assessment provides estimates of resource availability, peak demand levels and reserve capacity during anticipated 2006 peak load conditions for the ISO control area. These forecasts are intended to represent a reasonable range of probable conditions to help operating personnel plan for a range of possible conditions. This report uses and builds off of the data and charts provided in the 2005 Summer Operations Assessment. This report includes operating forecasts of 2006 peak demand levels for both a “most likely” system condition and describes a few typical scenarios the ISO may need to respond to under “adverse” system condition. Document Locations: |