MLCC Guide Documentpdf 1411K Summary:MLCC Guide Document, Minimum Load Cost Compensation (MLCC) Extract:In 2001 The Federal Energy Regulatory Commission (FERC) imposed a "must offer" obligation to generators with a Participating Generator Agreement (with limited exceptions) requiring that they offer all of their available generation to the ISO. This obligation applies to: All Generators that have Participating Generator Agreements (PGAs) and Non-Public Generators in California which use the interstate transmission grid. The Minimum Load Cost Compensation charge types are the vehicles for recovering these costs and allocating them to the market. Document Locations: |